New York Presbyterian Morgan Stanley Children’s Hospital
We served as the Prime Contractor responsible for replacing the dual air handlers serving operating rooms along with miscellaneous equipment such as a clean steam generator and VAV boxes while not disrupting the use of the operating rooms on the floor below.
Space restrictions required the old units be cut into small pieces to fit through a doorway and the new air handlers had to be delivered as “knocked down” built by hand in the final location.